Detour Details

  • Filtered for route: G3

    Standing Detour - Emergency West Busway Berry Street Tunnel Closures - Pittsburgh Regional Transit

    Begins: 1/1/2026 12:00:00 AM
    Ends: 12/31/2026 12:00:00 AM
     

    Summary:

    As necessary, during emergencies such as accidents, flooding of either end, landslides, ice or snow, Pittsburgh Regional Transit and its departments, primarily Road Operations, Special Services or Port Authority Police may opt to temporarily close the Berry Street Tunnel on the agency's West Busway as a temporary safety measure until the situation is rectified. When necessary, the detour will be initiated - and stopped - through notification by Bus Traffic Operations or by Road Operations, Special Services or Port Authority Police personnel responding to the scene. Due to turning and gradient issues on the detour, a return to tunnel operation will be announced as soon as it is available. A secondary but lengthier detour is provided for articulated buses Pittsburgh Regional Transit operates, and over-the-road motor coaches operated on Beaver County Transit Authority's Route 4 Pittsburgh-Chippewa Express due to clearance issues along the primary detour (turns) and if needed during winter months and snowfalls as an alternative as gradients are severe on the primary detour.
    Affected Route(s):
    Route:
      G2 West Busway   G3 Moon Flyer   28X Airport Flyer   G31 Bridgeville Flyer   BCTA Route 4 - Chippewa - Pittsburgh Express   FRT Washington, Pa - Pittsburgh Commuter
    Stops:
    Discontinued
      Inbound West Busway Ingram Station Inbound Platform Stop C (15280)
    Discontinued
      Inbound West Busway Sheraden Station Inbound Platform Stop C (15281)
    Established
      Inbound Ingram Ave Ramp at Ingram Station Outbound Platform
    Established
      Inbound Chartiers Busway Ramp #1 at Sheraden Station Park & Ride Lot
    Discontinued
      Outbound West Busway Sheridan Station Outbound Platform Stop A (18579) & Stop B (15270)
    Discontinued
      Outbound West Busway Ingram Station Outbound Platform Stop A (18720) & Stop B (18729)
    Established
      Outbound Chartiers Ave Busway Ramp #1 at Sheraden Station Inbound Platform Sidewalk
    Established
      Outbound Ingram Ave Busway Ramp opp Ingram Station Outbound Platform
    Route:
      G2 West Busway   G3 Moon Flyer   28X Airport Flyer   G31 Bridgeville Flyer   BCTA Route 4 - Chippewa - Pittsburgh Express   FRT Washington, Pa - Pittsburgh Commuter
    Stops:
    Discontinued
      Inbound West Busway Ingram Station Inbound Platform Stop C (15280)
    Discontinued
      Inbound West Busway Sheraden Station Inbound Platform Stop C (15281)
    Established
      Inbound Ingram Ave Ramp at Ingram Station Outbound Platform
    Established
      Inbound Chartiers Busway Ramp #1 at Sheraden Station Park & Ride Lot
    Discontinued
      Outbound West Busway Sheridan Station Outbound Platform Stop A (18579) & Stop B (15270)
    Discontinued
      Outbound West Busway Ingram Station Outbound Platform Stop A (18720) & Stop B (18729)
    Established
      Outbound Chartiers Ave Busway Ramp #1 at Sheraden Station Inbound Platform Sidewalk
    Established
      Outbound Ingram Ave Busway Ramp opp Ingram Station Outbound Platform